Detail Cantuman
Pencarian Spesifik
Journal
Journal of Construction Engineering and Management, Vol.132(7)
Construction Delays and Their Causative Factors in Nigeria.
Model for Financial Renegotiation in Public-Private Partnership Projects and its Policy Implications : Game Theoretic View.
Procurement Routes in Public Building and Construction Projects.
Survey of the Construction Industry Relative to the Use of CPM Scheduling.
Statistical Considerations for Predicting Residual Value of Heavy Equipment.
Model for Automated Monitoring of Fail Hazards in Building Construction.
Ketersediaan
00000837 | JOU Con 132(7) 2006 | My Library | Tersedia |
Informasi Detail
Judul Seri |
-
|
---|---|
No. Panggil |
JOU Con 132(7) 2006
|
Penerbit | ASCE : s.i.., 2006 |
Deskripsi Fisik |
794 p. : ill. ; 28 cm.
|
Bahasa |
English
|
ISBN/ISSN |
07339364
|
Klasifikasi |
JOU
|
Tipe Isi |
Soft Cover
|
Tipe Media |
Print Book
|
---|---|
Tipe Pembawa |
-
|
Edisi |
-
|
Subjek |
-
|
Info Detail Spesifik |
-
|
Pernyataan Tanggungjawab |
-
|
Versi lain/terkait
Tidak tersedia versi lain